Neubau Medizinisches Zentrum Spital Nidwalden

Stans, Switzerland
Visualization © maaars
Visualization © maaars
Visualization © maaars
Architects
Giuliani Hönger Architekten
Location
6370 Stans, Switzerland
Year
2027

SOMMERVOGEL

Through the formation of the striking head building and the arrangement of the low-rise building, the extension gives the Nidwalden Hospital a new face and at the same time merges the existing buildings into an overall ensemble.

The newly located main entrance to the Nidwalden hospital is accessed via a generous green space, which replaces the existing outdoor parking spaces and from which the large event hall and the staff oasis are clearly visible as the end of the two buildings.

The sustainable timber construction project looks for similarities to the existing buildings in terms of structure and degree of openness, while at the same time showing a clear constructive structure and internal and external materialisation. The structure of the façade elements, which are covered with photovoltaics, creates an interesting interplay of light and shadow that lends the structure of the new building its lightness.

Procedure: Competition 2022–2023, 1. Prize

Related Projects

  • Gebäudeadaptierungen Rathausbereich - Zwentendorf
    maul-architekten zt gmbh
  • FON - Housing and Kindergarten Fontanastrasse
    GERNER GERNER PLUS
  • GOLD - Housing Goldberg
    GERNER GERNER PLUS
  • BENE - Housing Benedikt
    GERNER GERNER PLUS
  • PUCH - Housing Puchsbaumgasse
    GERNER GERNER PLUS

Magazine

Other Projects by Giuliani Hönger Architekten

Fachhochschule Sihlhof
Zurich, Switzerland
Hörsaalgebäude Weichenbauhalle vonRoll
Bern, Switzerland
Fussgänger- und Fahrradbrücke Steigerhubel
Bern, Switzerland
Universitätsspital Klinikum 2
Basel, Switzerland
Fachhochschulzentrum Graubünden
Chur, Switzerland